PAST PERFORMANCE

MIW Power1.png

2 EXHAUST SILENCER STACKS

DURATION:

WEIGHT:

CUSTOMER:

LOCATION:

May 2017 - October 2017

52 Tons

National Grid Generation, LLC

Barrett Plant - Oceanside, NY

2 EXHAUST SYSTEMS WITH SILENCERS

DURATION:

WEIGHT:

CUSTOMER:

LOCATION:

August 2015 - April 2016

800+ Tons

Wolverine Power Supply Cooperative

Alpine Power Plant - Gaylord, MI

Moran Iron Works was awarded the contract to supply design, engineering, fabrication, and installation of two exhaust systems for Wolverine Power. The exhaust systems were installed at Wolverine’s Alpine Power Plant located in Elmira Township near Gaylord, Michigan. The plant utilizes two General Electric Frame 7FA.05 turbines for natural gas to generate over 430 megawatts of nameplate electricity.


MIW’s exhaust system design employed noise abatement guidelines and resulted in two of the most efficient exhaust systems in use. The systems required approximately 800 tons of steel to construct.

FRAME 7B DIFFUSER

DURATION:

WEIGHT:

CUSTOMER:

LOCATION:

March 2015 - September 2015

10,000 lbs

Universal AET

Boulder, CO

Moran Iron Works was awarded a contract to fabricate a replacement diffuser assembly for install at Universal AET’s customer.

​

This unit was fabricated using 304H, high carbon stainless steel, for durability in the extreme heat of a Frame 7B exhaust. Machined flanges to hold tight tolerances and shipped direct to the project site.

SILENCER & TRANSITION FABRICATION, PLENUM REPAIRS

DURATION:

WEIGHT:

CUSTOMER:

LOCATION:

Moran Iron Works was awarded the contract to fabricate and deliver a new Frame 5 silencer.  The work also included demo of the old silencer unit and installation of the newly fabricated one.

​

This unit was shipped via oversized load to Stock Key / Key West in one piece with lifting lugs installed for both rolling and lifting. Plenum repairs were also required due to years of degradation in the salt water environment.

October 2015 - February 2016

47,000 lbs

Keys Energy / Florida Municipal Power Agency (FMPA)

Stock Key, FL

FRAME 5 SILENCER & TRANSITION

DURATION:

WEIGHT:

CUSTOMER:

LOCATION:

Moran Iron Works was awarded the contract to fabricate a complex silencer and plenum heat shields for a 40 plus year old Frame 5 unit. This silencer stack had three levels of baffles for maximum performance. The plenum heat shields were replaced due to age and replacements were installed without the removal of the diffuser.

 

This unit was shipped via oversized load to Douglas in one piece with lifting lugs installed for both rolling and lifting.

​

The project was completed and delivered in three months.

August 2014 - November 2014

50,000 lbs

Arizona Public Service

Douglas, AZ

COMPLETE AQCS DUCTING

DURATION:

WEIGHT:

CUSTOMER:

LOCATION:

February 2013 - September 2014

3,382 Tons

Consumers Energy

JH Campbell Plant - West Olive, MI

In September of 2014, Moran Iron Works completed its largest project to date, which kicked off in February of 2013. Over the year and a half period, eight barge loads of fabricated ductwork were shipped to the JH Campbell Plant in West Olive, Michigan. 
 

This project was one of the most ambitious undertakings thus far, weighing in at over 3,382 Tons. More than 70,000 man hours in the shop were spent handling, processing, fabricating, and modularizing this Air Quality Control System Ducting. Our crews spent an additional 10,000 man hours at Port Calcite modularizing sub-assemblies and loading the barges.

MODULAR METAL SOLUTIONS FOR GENERATIONS