PAST PERFORMANCE

MIW Hydro.png

MACHINE, FABRICATE, PAINT, PACKAGE AND DELIVER FOUR (4) DAM GATES FOR STILLHOUSE DAM

DAM GATES

OWNER

LOCATION

WEIGHT

MATERIAL

DURATION

U.S. Army Corps of Engineers - Subcontracted by Gracon, LLC
Stillhouse Dam, Texas
13,000 lbs each
A588 Plate and A36 Plate Stock
January 2019 - Novmber 2020

MACHINE, FABRICATE, PAINT, PACKAGE AND DELIVER FOUR (4)

SETS OF STOP LOGS TO THE ROCK ISLAND DAM

STOP LOGS

OWNER

LOCATION

WEIGHT

MATERIAL

DURATION

Chelan County P.U.D. Number 1

Rock Island Dam, WA

175,098

A572 GR 50 Carbon Steel, A276 304 Stainless Steel, A36 Carbon Structural Steel

June 2017 - February 2018

FABRICATE AND DELIVER 100 ALUMINUM DAM BOARDS

DAM BOARDS

OWNER

LOCATION

WEIGHT

MATERIAL

DURATION

U.S. Fish & Wildlife Service

Pendills/Sullivan Creek - Brimley, MI

2.52 tons

Aluminum

October 2017 - December 2017

FABRICATE AND DELIVER 96 LOG SCREEN INSERTS - ALL "HOT DIP" GALVANIZED

LOG SCREENS

OWNER

LOCATION

WEIGHT

MATERIAL

DURATION

Eastern Generation

Astoria, NY

29,440 lbs

3/16" Hot Rolled Carbon Steel

January 2017 - March 2017

FABRICATE AND DELIVER 100 ALUMINUM DAM BOARDS

COFFERDAM TEMPLATE

OWNER

LOCATION

DURATION

U.S. Army Corps of Engineers - Subcontracted by Durocher Marine, a division of Kokosong Construction Company, Inc.

Soo Locks Complex - Sault Ste. Marie, MI

September 2009 - October 2009

Moran Iron Works fabricated a template for a set of cofferdams. By definition, a cofferdam, sometimes called a coffer, is a temporary enclosure built in water that allows for an area to be pumped out, forming a dry environment for work to be performed. They are typically welded steel structures with cross bracing enclosed in sheet piling.


These cofferdams were built for the Soo Lock Complex, Sault Sainte Marie, Michigan, U.S. Army Corps of Engineers Detroit District. They were used to dewater the locks and allow maintenance and repairs to be performed during the annual lock closure.

 

“We picked the assembled template, set onfloats, secured in position, set all 12 legs, removed floats, lowered to working level and installed most of the leg bolts. Everything performed better than could reasonably be expected. 
All of the Durocher and Moran dimensions match our intent within a fraction of an inch. Actual center of template is within 0.1” of Corps design center so they had the lock walls located rather accurately too. Circumference was measured within 0.25” of theoretical from the Moran shop drawing. This is in over 271 feet! We probably had incorrect tension in the tape. 
Thanks again for your creativity in the design phase and the excellent workmanship.” - Stan Neff, P.E., Operations Manager, Durocher Marine, a Division of Kokosing Construction Company, Inc.