Silencer and transition fabrication, plenum repairs

  • Customer: Keys Energy / Florida Municipal Power Agency (FMPA)

  • Location: Stock Key, Florida

  • Duration: October 2015 - February 2016

  • Weight: 47,000 lbs

  • Material: A36 Shell, 409 Stainless Liner/Perforated, Insulation

  • Outage Time: 8 days

Moran Iron Works was awarded the contract to fabricate and deliver a new Frame 5 silencer.  The work also included demo of the old silencer unit and installation of the newly fabricated one.

This unit was shipped via oversized load to Stock Key / Key West in one piece with lifting lugs installed for both rolling and lifting.

Plenum repairs were also required due to years of degradation in the salt water environment.